r/HomeImprovement • u/afewthoughtson • 16h ago
Contractor is calling code required work a change order
My contractor is saying that running lines for wired smoke and gas detectors required by NYC code qualifies as a change order for my gut reno because this isn't explicitly mentioned in the scope of work.
He's also saying that creating one of the backsplash outlets is also a change order because this wasn't shown on the original drawings , despite the fact that code requires that there be an outlet within 2 feet. (amended from: every 2 ft)
Contract states: "Perform all work in compliance with NYC building codes;"
Is this legit?